Freitag, 25. April 2014

Little Mackenzie


While today the sun was almost burning so that the melting snow forms small streams everywhere in town, we continued preparing for the certification flight of Polar 6. The PMS probes were unpacked and tested in lab and at the aircraft. Cabin instruments were also tested and repaired thoroughly so that despite of some problems we are almost ready to have Polar 6 in the air tomorrow.  Although the warm temperatures of up to 7°C are not what we have and still do expect for ideal measurements, it really helped to work on the aircraft. Screwing, wire testing and calibrating without gloves was highly appreciated.

Keine Kommentare:

Kommentar veröffentlichen